Project Name:1143 Thomas Goodwater Drive
Project Number:RSAN0759
Project Description:On Well System presently. Would like to know the costs to tie-in to Mt. Pleasant Water. Several neighbors have tied in to the Mt. Pleasant Water System at Hwy.17 and Thomas Goodwater Drive. Would it be more feasible to tie in at Tupelo Branch Rd? My property is located directly behind the Mt. Pleasant Water Service/Equipment location on Darrell Creek Trail Dr., and maybe that's a possibility to tie-in on that road. Please let me know the feasibility and the costs I would incur as a result of tying in to Mt. Pleasant Water.
Contractor:
Engineer:
Project Manager:Peter Fennell
Project Inspector:
Current Work Activity: