Project Name: | First Palmetto Expansion |
Project Number: | CSAN0604 |
Project Description: | Owner proposes to construct one (1) 6” SDR26 sewer service, approximately 65 LF in length, that taps into an existing sewer main along Lymington Drive. In addition, the owner proposes to construct two (2) 1” water services, approximately 45 LF in length, that tap into an existing water main along Beau Castle Road. Both water and sewer lines service a proposed 5,000 sq.ft. 2-story office building.” |
Contractor: | |
Engineer: | Earthsource Engineering |
Project Manager: | |
Project Inspector: | |
Current Work Activity: |