| CEN0074 | Legacy Patriots Point | Seamon Whiteside & Associates, LLC | A 176 unit apartment complex is to be constructed with associated fire, domestic, and irrigation service lines.
A proposed 8" line is to connect to an existing 12" PVC water main located just outside the property line to provide water for the site.
|
| CEN0084 | Public Services Operations Center | Davis & Floyd, Inc. | Water and sewer infrastructure for 3 commercial facilities under 1 owner.
Installation of 6" water main, 8" water main, fire hydrants, water services, FDC's, 6" gravity sewer, 8" gravity sewer, manholes, 4" sewer services, oil/water separators, 2" force main, and 2 grinder pump stations.
Relocation of existing 2" force main
2 connections to existing sewer system
2 connections to existing water system |
| CEN0087 | Mount Pleasant Regional Airport T-Hangar Development Project | Holt Consulting Company | The Charleston County Airport Authority intends to expand the existing tie-down apron area to the east and construct two nested T-Hangars. Based upon the preliminary layout, the two structures may consist of one 9-unit and one 15-unit nested T-Hangars. Each Hangar will include electrical power, internal overhead lights, light switches, electrical outlets, exterior lights over each hangar door, and bifold doors.
In addition to the expansion of the apron area and construction of the proposed T-Hangars, the project will include relocating three existing apron light poles, and the existing water and force main lines owned and maintained by the Mount Pleasant Waterworks Department. The design of the water and force main lines shall be in compliance with the Mount Pleasant Waterworks Department. Based on the relocation of these two utilities, a revised deed and plat will be prepared associated with the easement to the Mount Pleasant Waterworks Department.
|
| CEN0095 | Carolina Park Sports Complex - Phase 3 | SeamonWhiteside | Installation of 2 water service lines. |
| CSAN0277 | Bowman Place Building A | Hoyt + Berenyi LLC | Demolish existing buildings and construct a new (2) two story commercial spec building. The building will total approximately 10,592 SF (7,736 SF 1st Floor, 2,855 SF 2nd Floor) and will have (8) eight tenant spaces. |
| CSAN0402 | Live to Play Campus Parking Lot Renovations | Stantec | Relocation of 2 existing fire hydrants to new parking lot island locations as part of layout changes to the existing parking lot. |
| CSAN0410 | Bowman Place Final Phases | Hoyt + Berenyi | Demolish and abandon existing utilities and the construction of (3) three new single-story buildings totaling approximately 22,000 square feet with new utilities (water and sewer) required to serve the facilities. |
| CSAN0426 | LIDL - Mount Pleasant | Kimley-Horn and Associates | The proposed project is an approximately 5,900 SF expansion of the existing shopping center to accommodate a proposed grocery user. Improvements also consist of dumpster enclosure relocations, a depressed loading dock, and driveway improvements. |
| CSAN0470 | Crumbl Mt. Pleasant | Chastain Construction | We are building out this space at 1485 US 17 N SUITE B, MT Pleasant for a Crumbl Cookie Location. Plans call for above ground grease trap. |
| CSAN0528 | Innovation Way Office Building - Meter change | Civil Site Environmental | Installation of 2" meter in place of existing meter for existing building |
| CSAN0544 | 230 Mathis Ferry Fire | Hancock Piping/ Fire Protection | Installation of one fire service with associated apparatuses. |
| CSAN0564 | Mozzo Deli | | Upfit for a Deli to be constructed within the new shopping complex |
| CSAN0582 | Oakland Market - 1140 Oakland Market Road | Oakland Properties, LLC | New water meter installation. |
| CSAN0594 | Grassroots Community Park | Earthsource Engineering | Small community park development with new meter/backflow needed for irrigation. |
| REN0093 | Melvin Bennett Subdivision | | Sub-division of 1.6 acres into 1 acre commercial and 2 residential lots |
| REN0099 | Boston Grill Subdivision (Hub City Holding, LLC) | Hub City Holding, LLC | We are subdivided 1 parcel into 5 |
| REN0153 | Liberty Hill Farm Phase 2B | SeamonWhiteside | Extension of an existing water main and adding water services for 100 single family residential lots. Extension of an existing sewer main and addition of sewer services for 100 single family residential lots. |
| REN0155 | Lieben Road Single Family | Barrier Island Engineering & Consulting | Construction of 4 single family homes with water service connections on Lucinda Street (3 new, 1 reuse of existing service). A sewer main extension with a MPW easement is proposed along the rear of the lots to provide sewer service. |
| RSAN0342 | 1843 Rifle Range Road (aka Fiddlers Cove) | Sitecast | Subdivide existing 7 acre parcel into 16 building lots (R-1 zoning in the Town of Mount Pleasant) |
| RSAN0568 | 1420 Chandler Road | | Install Force Main Sewer Line, grinder pump and tank |
| RSAN0590 | Pine Hollow Subdivision | Earthsource Engineering | Owner proposes to subdivide existing 1.87-acre parcel at 964 Pine Hollow Road into three new parcels and install a new hydrant assembly, double wye 6” sewer service and two new 1” water services with 5/8” meters. |