Project Number Project Name Engineer Description
CEN0059Atlantic Beach HouseSitecast, LLCFour Multi-story buildings to accommodate 224 Multi-Family residential units, a Clubhouse w/ pool and associated amenities.
CEN0082Boone Hall Water ServiceThomas & HuttonConnect a proposed 8" water service to the existing 20" water main located along the west side of Hwy 17. An above ground water meter and backflow preventer will be installed outside of the Hwy 17 right-of-way. The proposed 8" water service line will be extended west across the property to serve the various existing facilities located near the plantation home, as well as provide fire protection for a proposed renovation of the existing Cotton Gin building.
CSAN0276Fender Mender of Mt. PleasantOceana Design LLCNew Auto Body Shop 9,200 Sq. Ft.
CSAN0277Bowman Place Building AHoyt + Berenyi LLCDemolish existing buildings and construct a new (2) two story commercial spec building. The building will total approximately 10,592 SF (7,736 SF 1st Floor, 2,855 SF 2nd Floor) and will have (8) eight tenant spaces.
CSAN0348Oak CourtCivil Site EnvironmentalConstruction of commercial building on existing building pad. Work to include installation of water service from existing water main and sanitary sewer service.
CSAN0376Candlewood Hotel RenovationsCPIMPW Easement Plat to be submitted
CSAN0380Lucy Garrett Beckham High School - Tennis CourtsADC EngineeringConstruct new tennis courts for high school use. New sidewalk and curb, court striping, landscape, and drinking fountain.
CSAN0392Time To Shine Ben SawyerEarthsource Engineering Co IncUp-fit of existing commercial building to be converted to a car wash with associated parking upgrades.
CSAN0402Live to Play Campus Parking Lot RenovationsStantecRelocation of 2 existing fire hydrants to new parking lot island locations as part of layout changes to the existing parking lot.
CSAN0426LIDL - Mount PleasantKimley-Horn and AssociatesThe proposed project is an approximately 5,900 SF expansion of the existing shopping center to accommodate a proposed grocery user. Improvements also consist of dumpster enclosure relocations, a depressed loading dock, and driveway improvements.
CSAN04283002 / 3022 SOUTH MORGANS POINT ROAD METER REPLACEMENTCivil Site EnvironmentalReplacement of existing building master meters with individual tenant space meters
REN0066Cheves Residence Utility ExtensionSeamonWhiteside+Associates, Inc.Installation of force main and 2 grinder pump stations to serve a single family house and a guest house.
REN0074Alice Smalls Subdivision Phase I & IIEarthsource EngineeringNew water & sewer main extensions for a 19 Lot residential subdivision.
REN0093Melvin Bennett SubdivisionSub-division of 1.6 acres into 1 acre commercial and 2 residential lots
REN0111North Palmetto Fort Sewer ImprovementsEarthsource EngineeringInstallation of 265 LF 8" gravity sewer main and 3 manholes within existing public right-of-way and easement serving a new future residential subdivision.
REN0131Carolina Park Phase H.2SeamonWhitesideThe purpose of the project is the construction of a new phase of infrastructure and residential housing in the existing Carolina Park development. Phase H.2 consists of 34 lots which require water and sewer service.
REN0135Carolina Park Phase F.2BSeamon Whiteside55 lots in Riverside in Carolina Park. This phase was previously submitted as Phase F.2=86 lots. This phase has been subdivided into Phase F.2A=31 lots and Phase F.2B=55 lots.
RSAN0367Wigfield ResidenceSeamonWhitesideConstruction of new home
RSAN0370561 East Hobcaw Dr. Grinder Pump & FMForsberg EngineeringGrinder Pump and FM to existing gravity manhole at end of cul de sac