Project Name:CMOM Wastewater Rehab (SRF 511-51)
Project Number:SCL1903
Project Description:Rehabilitating and lining existing failing gravity sewer mains within the Baytree and Cooper Estates subdivisions. The work will consist of digging up failing sewer lines to replace the line with new PVC sewer mains and then lining the sewer main with a flexible non-woven polyester felt liner. Residents should expect impacts to roadways and the road shoulder along most roads within the subdivision. Homeowners yards will be affected throughout construction and restored to pre-existing conditions.
Project Budget:$4,513,511.28
Contractor:Don Moorhead Construction
Engineer:Frazier
Project Manager:Trae Borden
Project Inspector:Wayne Lee (843.388.1111 )
Current Work Activity: